4. What is your lead time from approved design?
The honest answer is a range in weeks tied to scope, counted from the day design is approved, not from the day you sign. For reference, EventFab’s brand activation page puts custom fabrication at 3 to 6 weeks from approved design, with rush possible depending on scope. The same page advises starting 6 to 8 weeks before the activation for a custom build, 10 to 12 weeks for larger builds, and 2 to 3 weeks when the activation uses existing rental inventory.
New York adds its own time. Our guide to planning a brand activation in NYC treats 8 to 12 weeks as comfortable. A rush down to about 4 weeks can work, but only when the venue is locked, the scope is modest and no DOT permits are needed.
Red flag: a timeline with no design-approval date on it. Every later date depends on that one.
5. Who handles the permits, and when?
For an indoor private venue, the venue’s own permits are usually enough. Move onto a sidewalk, plaza or street, or add generators, propane, alcohol or amplified outdoor sound, and the picture changes. Our NYC planning guide lists the city filings that can apply (DOT, MOFTB or FDNY) and puts their lead time at 4 to 6 weeks. Ask who tracks those requirements and who talks to the landlord. On pop-ups, we advise on permit requirements and coordinate with landlords, venues and building management on load-in, structural requirements and fire safety.
Red flag: “Permits are the venue’s problem” for a footprint that faces the street.
6. Have you worked union venues, and will you supply COIs?
Union venues in NYC and Boston have their own labor rules, stewards and minimums, and they shape your install schedule as much as the build does. Ask which union houses the partner has loaded into recently and how they plan crew around house labor. Ask for certificates of insurance up front, because venues often won’t schedule load-in without them.